U-Cart Concrete
Pre-Mixed, Trailer-Hauled Concrete
Price includes trailer rental for 2 hours
Mixing 9 a.m. to 2 p.m. Monday through Saturday
Yardage | CU. FT. | 6 SK |
---|---|---|
1-1/4 | 33.8 | $350 |
1 | 27 | $280 |
7/8 | 23.6 | $265 |
3/4 | 20.25 | $250 |
5/8 | 16.8 | $235 |
1/2 | 13.5 | $220 |
3/8 | 10 | $205 |
1/4 | 6.8 | $190 |
A sack references one 94 lb. bag of Portland Cement per yard.
1 yard trailer can be towed by a full size vehicle with a 5000lb. conventional weight carrying towing capacity.
1-1/4 yard trailer required a true 3/4 ton truck with a class-3 receiver hitch.
We reserve the right to inspect your vehicle and determine if it is suitable for towing our trailers. If it does not meet our standards, we offer rental trucks capable of towing our concrete trailers
Concrete Calculating Recommended Practice:
Allow for a 10% grace in volume for any spillage or variance in your forms.
Example: when using 2x4 boards for thickness, use 4" as thickness value, not its true 3 1/2".